Brokdorf nuclear power plant
Brokdorf nuclear power plant in Schleswig-Holstein is operated by PreussenElektra GmbH and Kernkraftwerk Brokorf GmbH & Co. oHG. Commercial operation began in 1986.
| Site | Brokdorf |
|---|
| Federal state | Schleswig-Holstein |
|---|
| Type (construction line) | Pressurised water reactor (pre-Convoy) |
|---|
| Current operator | Kernkraftwerk Brokdorf GmbH & Co. OHG |
|---|
| Manufacturer | KWU |
|---|
| Owner | PreussenElektra GmbH, Vattenfall Europe Nuclear Energy GmbH |
|---|
| Application date | 12 March 1974 |
|---|
| Start of construction | 1 January 1976 |
|---|
| First criticality | 8 October 1986 |
|---|
| First grid synchronisation | 14 October 1986 |
|---|
| Start of commercial operation | 22 December 1986 |
|---|
| Expiry of authorisation for power operation in accordance with the German Atomic Energy Act (AtG) | 31 December 2021 |
|---|
| Thermal reactor power | 3.900 MW |
|---|
| Gross electric capacity | 1.480 MW |
|---|
| Net electric capacity | 1.410 MW |
|---|
| Number of reactor coolant pumps | 4 |
|---|
| Number and mass of fuel elements | 193, mass per fuel element 859 kg |
|---|
| Number of fuel rods per fuel element | 16x16-20 (uranium); 16x16-24 (MOX) |
|---|
| Composition of the nuclear fuel | Uranium oxide with 4.45% U-235 max. uranium-plutonium MOX up to a reactivity equivalent of a uranium oxide fuel element nominally enriched with 4.0% U-235 |
|---|
| Number of control elements | 61 |
|---|
| Type of cooling system | River water cooling |
|---|