Emsland nuclear power plant
Emsland nuclear power plant in Lower Saxony is operated by Kernkraftwerk Krümmel GmbH & Co. oHG. Commercial operation began in 1988.
| Site | Lingen (EMS) |
|---|
| Federal state | Lower Saxony |
|---|
| Type (construction line) | Pressurised water reactor (Convoy) |
|---|
| Current operator | Kernkraftwerk Lippe-EMS (KLE) |
|---|
| Manufacturer | KWU |
|---|
| Owner | RWE Power, E.ON Kernkraft, E.ON Kernkraftwerksbeteiligungs-OHG |
|---|
| Application date | 28 November 1980 |
| Start of construction | 10 August 1982 |
| First criticality | 14 April 1988 |
| First grid synchronisation | 19 April 1988 |
| Start of commercial operation | 20 June 1988 |
| EExpiry of authorisation for power operation in accordance with the German Atomic Energy Act (AtG) | 15 April 2023 |
| Thermal reactor power | 3.850 MW |
|---|
| Gross electric capacity | 1.407 MW |
|---|
| Net electric capacity | 1.340 MW |
|---|
| Number of reactor coolant pumps | 4 |
|---|
| Number and mass of fuel elements in the reactor core | 193, mass per fuel element 850 kg |
|---|
| Number of fuel rods per fuel element | 300 |
|---|
| Composition of the nuclear fuel | 1.9 - 4.4 w/o U-235 (uranium oxide with 1.9 - 4.4 % U-235) |
|---|
| Number of control elements | 61 |
|---|
| Type of cooling system | Natural draft wet cooling tower |
|---|