Emsland nuclear power plant
Emsland nuclear power plant in Lower Saxony is operated by Kernkraftwerk Krümmel GmbH & Co. oHG. Commercial operation began in 1988.
Site | Lingen (EMS) |
---|
Federal state | Lower Saxony |
---|
Type (construction line) | Pressurised water reactor (Convoy) |
---|
Current operator | Kernkraftwerk Lippe-EMS (KLE) |
---|
Manufacturer | KWU |
---|
Owner | RWE Power, E.ON Kernkraft, E.ON Kernkraftwerksbeteiligungs-OHG |
---|
Application date | 28 November 1980 |
Start of construction | 10 August 1982 |
First criticality | 14 April 1988 |
First grid synchronisation | 19 April 1988 |
Start of commercial operation | 20 June 1988 |
EExpiry of authorisation for power operation in accordance with the German Atomic Energy Act (AtG) | 15 April 2023 |
Thermal reactor power | 3.850 MW |
---|
Gross electric capacity | 1.407 MW |
---|
Net electric capacity | 1.340 MW |
---|
Number of reactor coolant pumps | 4 |
---|
Number and mass of fuel elements in the reactor core | 193, mass per fuel element 850 kg |
---|
Number of fuel rods per fuel element | 300 |
---|
Composition of the nuclear fuel | 1.9 - 4.4 w/o U-235 (uranium oxide with 1.9 - 4.4 % U-235) |
---|
Number of control elements | 61 |
---|
Type of cooling system | Natural draft wet cooling tower |
---|