Summary

Emsland nuclear power plant in Lower Saxony is operated by Kernkraftwerk Krümmel GmbH & Co. oHG. Commercial operation began in 1988.

Details

General information

SiteLingen (EMS)
Federal stateLower Saxony
Type (construction line)Pressurised water reactor (Convoy)
Current operatorKernkraftwerk Lippe-EMS (KLE)
ManufacturerKWU
OwnerRWE Power, E.ON Kernkraft, E.ON Kernkraftwerksbeteiligungs-OHG

Operational data

Application date28 November 1980
Start of construction10 August 1982
First criticality14 April 1988
First grid synchronisation19 April 1988
Start of commercial operation20 June 1988
EExpiry of authorisation for power operation in accordance with the German Atomic Energy Act (AtG)31 December 2022

Technical data

Thermal reactor power3.850 MW
Gross electric capacity1.407 MW
Net electric capacity1.340 MW
Number of reactor coolant pumps4
Number and mass of fuel elements in the reactor core193, mass per fuel element 850 kg
Number of fuel rods per fuel element300
Composition of the nuclear fuel1.9 - 4.4 w/o U-235 (uranium oxide with 1.9 - 4.4 % U-235)
Number of control elements61
Type of cooling systemNatural draft wet cooling tower

Documentation

Emission of radioactive substances (annual data)http://nbn-resolving.de/urn:nbn:de:0221-2015072412951  
Reportable eventshttp://www.bfe.bund.de/EN/ns/events/reports/reports_node.html
Current remote monitoring datawww.odlonline.nlwkn.niedersachsen.de/start
AuthorityLower Saxony Ministry of Environment, Energy, Building and Climate Protection