Unit C Gundremmingen nuclear power plant
Unit C Gundremmingen nuclear power plant in Bavaria is operated by Kernkraftwerk Gundremmingen GmbH. Commercial operation began in 1985.
| Site | Gundremmingen |
|---|
| Federal state | Bavaria |
|---|
| Type (construction line) | Boiling water reactor (construction line 72) |
|---|
| Current operator | Kernkraftwerk Gundremmingen GmbH |
|---|
| Manufacturer | KWU |
|---|
| Owner | PreussenElektra GmbH, RWE Nuclear GmbH |
|---|
| Application date | 15 March1974 |
|---|
| Start of construction | 20 July 1976 |
|---|
| First criticality | 9 October 1984 |
|---|
| First grid synchronisation | 2 November 1984 |
|---|
| Start of commercial operation | 18 January 1985 |
|---|
| Expiry of authorisation for power operation in accordance with the German Atomic Energy Act (AtG) | 31 December 2021 |
|---|
| Thermal reactor power | 3,840 MW |
|---|
| Gross electric capacity | 1,344 MW |
|---|
| Net electric capacity | 1,284 MW |
|---|
| Number of reactor coolant pumps | 8 axial recirculation pumps |
|---|
| Number and mass of fuel elements | 784, total fuel mass excluding structural material approx. 136 t |
|---|
| Number of fuel rods per fuel element | 10x10 fuel rod configuration |
|---|
| Composition of the nuclear fuel | UO2/PuO2 (uranium dioxide, uranium-plutonium MOX) |
|---|
| Number of control elements | 193 |
|---|
| Type of cooling system | Water cooling tower |
|---|