Unterweser nuclear power plant in Lower Saxony is operated by PreussenElektra GmbH. Commercial operation began in 1979. The plant was shut down on 18 March 2011. Authorisation for power operation in accordance with the German Atomic Energy Act (AtG) expired on 6 August 2011. The first licence for decommissioning and dismantling was granted according to section 7 (3) AtG on 5 February 2018.
Details
General information
Site
Stadland (Kleinensiel district)
Federal state
Lower Saxony
Type (construction line)
Pressurised water reactor
Current operator
PreussenElektra GmbH
Manufacturer
KWU
Owner
PreussenElektra GmbH
Operational data
Application date
7 April 1971
Start of construction
1972
First criticality
16 September 1978
First grid synchronisation
29 September 1978
Start of commercial operation
6 September 1979
Shutdown date
18 March 2011
Expiry of authorisation for power operation in accordance with the German Atomic Energy Act (AtG)
6 August 2011
First decommissioning and dismantling licence
5 February 2018
Second dismantling licence
15 July 2021
Technical data
Thermal reactor power
3,900 MW
Gross electric capacity
1,410 MW
Net electric capacity
1,345 MW
Number of reactor coolant pumps
4
Number and mass of fuel elements in the reactor core